Clients & Projects

bridge-img1

Our Clients:

  • Qatar University
  • QOC – Qatar Olympic Committee
  • Ashghal
  • LOTUS Trading & Contracting
  • Gulf Light Co.
  • CCTC
  • Fitness First Club

Projects:

 

List of Projects Completed/Ongoing
Project
No.
Client
Project Title
Start
Date
Completion
Date
Main or
Subcontract
MOYS/TAC/FPD/OP/001/2015
Ministry Of Culture & Sports
Design Supply & Installation and Upgrade the Fire Alarm and Firefighting System at Sports Clubs and Federations
September
2015
Ongoing
Main
53/2013/2
014
Qatar
University
EPIC – Access Control System On Call
Basis Two Years
May 2014
Ongoing
Main
QU-ES-EYE Wash Station
Qatar
University
Supply, Installation, testing and commissioning of Emergency Eye wash station at the Chemical storage area- Qatar University
July  2015
August 2015
Main
QU-CF-201500085
Qatar
University
Supply, Installation, Testing , Commissioning and Maintenance  of Walk-In Chiller & Display Chiller at Women Activity Building.
July  2015
December 2015
Main
QU-DCT-14-15
Qatar
University
Supply and Installation Testing & Commissioning of Duct Work, Hoods,& Exhaust fan at QU Lab
December 2014
March    2015
Main
M/23/2013/2
014
Qatar
University
Design & Build Engineering services for the Cold Waste Room at Women Food Court Building at QU
January
2015
May 2015
Main
M48/20
13/2014
Qatar
University
Replacement of Motorized Roof
Shading-Green House
Oct 2014
July 2015
Main
MO-WO-
1330-2013
Qatar Olympic committee
Supply, Installation of New Fire Pump Full Set @Pump Room Phase 2 @ Al Wakrah SC
May
2014
July 2014
Sub- Contract
50/2013/2
014
Qatar
University
Replacement of External Lighting
System
April 2014
Nov 2014
Sub-Contract
C/66/2013
Qatar
University
Replacement of External Electrical
Panels at Qatar University
Sept 2013
Feb 2014
Main
CP747/3
ASHGHAL
Design & Construction of 1000mm
Transmission main From IC 62 To KM
83+500 Near Abu Samra
April
2012
March    2015
Sub-Contract
EPD/C/124
/2010
QSC/ Olympic committee
Upgrading Training Hall at Handball
Federation in Qatar Sports Club
January
2012
Dec 2012
Sub-Contract
CP747/2
ASHGHAL
Contract No.: C747/2
Design & Construction of 1000
Transmission Main From IC42 to IC62
Civil Project
January
2010
January
2011
Sub-Contract
P3610 (II)
Qatar
University
Infrastructure Package External Sewer
Network- Phase 1 (Water Reservoir)
February
2011
January
2012
Sub-Contract
CP747-2 DESIGN AND CONSTRUCTION OF 1000 TRANSMISSION MAIN FROM IC42 TO IC62
The project was completed on January 24, 2011. The works consist of construction of TSE mains along Salwa Road from IC42 to IC62 comprising of approximately 21.5 km of 1000 mm dia. GRP pipes in trench/micro tunneling and feeder pipes from TSE mains to QPMC Sand Plant consisting of approximately 3.8 km of 500 mm dia. GRP pipe in trench with construction of 70 chambers. With 50km fiber optics cables, complete SCADA system (FO& GSM communications) & instrumentation controls from QPMC sand plant to Doha west main control station
  • QATAR UNIVERSITY – INFRASTRUCTURE PACKAGE EXTERNAL SEWER NETWORK PHASE I AND WATER RESERVOIR
The project was completed on October, 2011. The project site is located at Qatar University premises. Construction of external sewer network system of approximate 5km sewer main, house connections, two lifting stations and relevant MEP work, main water reservoir which boosting the water line pressure that feeds all the facilities at Qatar university